Emerson
Project Overview:
Ocean Lifespaces successfully completed the project for Emerson industrial facility in Chennai, which includes the design and execution of complex MEP (Mechanical, Electrical, and Plumbing) systems. The project involved developing a cutting-edge manufacturing unit for Emerson, focusing on optimizing operational efficiency while integrating sustainable and high-performance systems.
Objective:
- Create an industrial facility for Emersons regulators and ATS manufacturing unit, ensuring efficient energy usage and advanced manufacturing capabilities.
- Ensure compliance with international standards while optimizing operational efficiency.
Scope of Work:
- Electrical Works:
- 11 KV Substation
- 1600 KVA Transformer
- HT Panel, Busduct
- 3 x 320 KVA DG
- TTA LT Panels & Lowside Works
- HVAC Works:
- 3 x 100 TR Air Cooled Chiller
- VRF Units, V. Fans, HVLS Fans
- Lowside Works
- FPS Works:
- FM Approved Fire Pumps
- GFS Tanks, External & Internal Hydrant
- Roof Sprinkler System
- ELV Works:
- Addressable FA & PA System
- Access Control & CCTV System
- PLC Based BMS System
- Solar Works:
- 165.5 KWp Rooftop Solar System
- PHE Works:
- IGBC Gold Rated Building
- Hydro Pneumatic System
- 100 KLD STP, 1000 LPH WTP, 500 LPH RO
Approach:
- Comprehensive MEP Integration: The project required a seamless integration of various MEP systems, including electrical, HVAC, fire safety, and water treatment, to ensure smooth operations and energy efficiency.
- Sustainability Focus: The use of a 165.5 KWp rooftop solar system and the implementation of IGBC Gold-rated building features highlight the commitment to sustainability and energy-efficient design.
- Precision Engineering: Each system, from the electrical to the HVAC, was designed with precision, focusing on optimizing energy usage, reducing operational costs, and maintaining a high level of safety and performance.
- Timely Delivery: Despite the complexity of the systems, the project was completed within the specified timeframe, ensuring the plant was operational without delays.
Results:
- Energy Efficiency: The incorporation of the rooftop solar system and energy-efficient MEP systems ensures reduced operational costs and a lower environmental footprint.
- Advanced Manufacturing Facility: The Emerson facility now operates with state-of-the-art manufacturing and safety systems, enhancing productivity and compliance with international standards.
- Client Satisfaction: Emerson was highly satisfied with the comprehensive delivery of the industrial project, emphasizing the high-quality execution and the ability to meet all functional requirements.
Key Takeaways:
- Successfully executed a complex industrial project with advanced MEP systems.
- Focused on sustainability with the integration of a rooftop solar system and IGBC Gold certification.
- Delivered a high-performing manufacturing unit equipped with cutting-edge infrastructure.
- Completed the project on time, meeting all client requirements.
Conclusion:
This project showcases Ocean Lifespaces’ expertise in delivering large-scale industrial facilities with integrated MEP systems that enhance operational efficiency, safety, and sustainability. The Emerson manufacturing unit stands as a testament to the teams ability to manage complex, high-value projects with precision and excellence.